Project Improvements and Map
The Salmon Creek Interchange Project includes the following improvements. A map is available for your review.
Improvements to the interstate system:
- A new interchange at NE 139th Street and I-5 that provides for movement in three directions: a northbound on-ramp, a northbound off-ramp, and a southbound on-ramp (the interchange will be designed so that movement in the fourth direction, the southbound off-ramp, could be added in the future)
- Removal of the on-ramp from NE 134th Street to I-5 northbound and associated changes to the traffic signal
- An exit-only lane to NE 134th Street from I-205 northbound resulting in a two-lane off-ramp
- A new northbound lane from NE 139th Street to NE 179th Street to accommodate the new on-ramp from NE 139th Street
- Reconstructed I-5 bridges over I-205 to accomodate future widening
Improvements to the local road system:
- A new segment of NE 139th Street from NE 10th Avenue to NE 20th Avenue that passes over I-5 and I-205
- Widening of NE 139th Street to two lanes in each direction with bike lanes, sidewalks, and a raised median from NE Tenny Road to NE 23rd Avenue
- Redesign of the intersection of NE 139th Street and NE Tenny Road to a signalized “T” configuration with NE 139th Street being the main through route
- Modification of the traffic signal and intersection of NE 134th Street and NE 10th Avenue to accommodate the other changes in the area and truck turning movements
- Improvement of the intersection of NE 20th Avenue and NE 139th Street with double left turn lanes and right turn lanes in all directions
- Relocation of the C-Tran Park-and-Ride from NE 134th Street to a new location near the corner of NE 139th Street and NE 10th Avenue
- Widening of NE 10th Avenue from NE 134th Street to NE 149st Avenue to one lane in each direction with a center turn lane, bike lanes, and sidewalks
Additional improvements are likely to be needed in the area immediately after construction of the first phase is complete. These phase two improvements include:
- A new southbound on-ramp from NE 134th Street at NE 23rd Avenue to I-205 southbound
- Widening of NE 134th Street from NE 20th Avenue to NE 23rd Avenue including the bridge over I-205
Since the project is still in development, additional elements could be added if environmental, transportation or engineering study determines that they are necessary. These are called “risk” items and, if needed, could increase the project's cost estimate.